Pipe Coating Line for Integrators

Finished large-diameter spiral welded pipe, stacked

Pipe Coating Line

Pipe Coating Line for Integrators

Coating lines for integrators fitting one to an existing mill. The window is square tube 25 × 25 to 125 × 125 mm, wall 1.0 to 4.0 mm, length 6 to 12 m, at up to 60 m/min, running loading, cleaning, heating, spraying, conveying, unloading and stacking.

What It Handles, How Fast, and How It Is Sold

  1. Workpiece window: square tube 25×25–125×125 mm, wall 1.0–4.0 mm, length 6–12 m.
  2. Line speed ≤ 60 m/min, takt designed to match the main line.
  3. Sold bundled — dismantled and containerised with the main line, MOQ about one set.

Programme Scope and Who It Is For

Our position of this line is accessory rather than standalone: the company’s four product categories are welded pipe equipment, slitting and cut-to-length, cold forming and H-beam lines, with the automatic spray line appended as an accessory.

For an integrator that makes the interface question — not the coating chemistry — the substantive one.

The application is pipe and section plants coating finished product in line, with pre-treatment, heating and spraying made continuous so the takt matches the main line.

Configuration Tiers and What Each Tier Includes

Supply for this family takes one specific form: the coating unit is dismantled and containerised together with the main line, delivered as one shipment and assembled on site as part of the same job, with a minimum order quantity of about one set and separate shipment negotiated case by case.

Frequently Asked Questions

What does the dealer/partner programme include?

Delivery is 50 to 90 days with plant-level customisation scheduled from our own manufacturing base. Programme terms are set out in writing with each partner. For this family the commercial form is bundling: the coating unit ships and is assembled with the main line, with a minimum order of about one set and separate shipment negotiated case by case. Delivery, payment and support follow the main line.

What is the minimum order and how are territories allocated?

There is no minimum order quantity and no territory allocation rule for this family. The only MOQ we apply is on the automatic spray coating line — about one set, bundled with a main line — and it does not extend to other equipment.

What are typical lead times and payment terms?

On-time delivery is the criterion agents actually judge on, because their own downstream customers depend on it.

Minimum Order and Stock Position

There is no minimum order quantity, no stock-holding requirement and no territory rule for this family. What we offer instead is the commercial frame those terms would sit inside: tiered configuration giving resale margin, 50 to 90 day delivery, and

Marketing and Technical Support Provided

Technical support covers a single point of contact and online support, both round-the-clock, engineers dispatched on site, and installation and commissioning included in the after-sales scope. Marketing support — co-branded material, lead sharing, demonstration equipment — is agreed case by case.

Payment is flexible: a thirty per cent deposit against seventy per cent before shipment, with third-party escrow and staged payment available and multiple trade terms supported.

From the Workshop

Coating line conveyor with finished square tube stacked alongsideCoating line conveyor running the length of the bayPipe Coating Line for Integrators — Hebei Tengtian works photo 3

Send Your Enquiry

Tell us the pipe outside-diameter range, the wall thickness and the output you need. An engineer reads every enquiry — it does not land in a general sales inbox.

Scroll to Top